EXPLORATION & PRODUCTION
ADJUSTED OPERATING PROFIT
FINDING & DEVELOPMENT COST
10.4 $/BOE
IN THE 2015–2017 PERIOD VS. 20 $/BOE IN THE 2012–2014 PERIOD
START-UP OF THE ZOHR GIANT FIELD
OVER 30 TCF
OF GAS IN PLACE. PRODUCTION PLATEAU IS EXPECTED AT 2.7 BCF/DAY
HYDROCARBONS PRODUCTION
1.82 MILLION BOE/DAY
(UP BY 3.2% FROM 2016), HIGHEST EVER LEVEL
DISCOVERED RESOURCES
1 BILLION BOE EQUITY
AT A COST OF APPROXIMATELY 1 $/BOE
STRONG CASH GENERATION
20.2 $/BOE
OR 14.1 $/BOE NET OF DISPOSALS
Innovative subsoil-analysis technology
HCP4, the most powerful computer in Europe, is at work in the Green Data Center in Ferrera Erbognone, revolutionising the study of deposits in the Oil and Gas sector through highly complex calculations.