All data
Main operating data |
|
2009 |
2010 |
2011 |
2012 |
2013 |
|
|
|
|
|
|
|
Offshore pipelines laid |
(km) |
1,000 |
1,365 |
1,682 |
1,435 |
1,106 |
Onshore pipelines laid |
|
716 |
385 |
889 |
543 |
433 |
Offshore structures installed |
(t) |
62,333 |
46,606 |
105,033 |
122,765 |
206,959 |
Onshore structures installed |
|
76,543 |
874,428 |
353,480 |
261,410 |
178,252 |
Offshore drilling |
(km) |
140 |
130 |
178 |
194 |
201 |
Onshore drilling |
|
719 |
881 |
985 |
953 |
821 |
Offshore wells drilled |
(units) |
54 |
44 |
64 |
104 |
127 |
Onshore wells drilled |
|
241 |
279 |
307 |
373 |
373 |
Drilling vessels |
|
|
|
|
|
Name |
Type |
Drilling plant |
Maximum depth (m) |
Drilling maximum (m) |
Other |
Perro Negro 2 |
Jack up |
Oilwell E 2000 |
90 |
6,500 |
Heliport provided |
Perro Negro 3 |
Jack up |
Ideco E 2100 |
90 |
6,000 |
Heliport provided |
Perro Negro 4 |
Jack up |
National 110 UE |
45 |
5,000 |
Heliport provided |
Perro Negro 5 |
Jack up |
National 1320 UE |
90 |
6,500 |
Heliport provided |
Perro Negro 7 |
Jack up |
National 1625 UE |
115 |
9,150 |
Heliport provided |
Perro Negro 8 |
Jack up |
NOV SSDG 3000 |
107 |
9,100 |
Heliport provided |
Scarabeo 3 |
Semi-submersible drilling platform helped propulsion system |
National 1625 DE |
550 |
7,600 |
Heliport provided |
Scarabeo 4 |
Semi-submersible drilling platform helped propulsion system |
National 1625 DE |
550 |
7,600 |
Heliport provided |
Scarabeo 5 |
Semi-submersible drilling platform helped propulsion system |
Emco C 3 |
1,900 |
8,000 |
Heliport provided |
Scarabeo 6 |
Semi-submersible drilling platform helped propulsion system |
Oilwell E 3000 |
500 |
7,600 |
Heliport provided |
Scarabeo 7 |
Semi-submersible drilling platform helped propulsion system |
Wirth GH 3000 EG |
1,500 |
8,000 |
Heliport provided |
Scarabeo 8 |
Semi-submersible drilling platform helped propulsion system |
NOV AHD-500-4600 |
3,000 |
10,660 |
Heliport provided |
Scarabeo 9 |
Semi-submersible drilling platform helped propulsion system |
Aker Maritime Ram Rig |
3,650 |
15,200 |
Heliport provided |
Saipem 10000 |
Ultra deep waters drillship, self-propelled, dynamic positioning |
Wirth GH 4500 EG |
3,000 |
9,200 |
Oil storage capacity: 140.000 bbl; heliport provided |
Saipem 12000 |
Ultra deep waters drillship, self-propelled, dynamic positioning |
NOV SSDG 5750 |
3,650 |
10,000 |
Heliport provided |
Saipem TAD |
Tender assisted drilling barge |
Bentec 1500 Hp |
150 |
4,877 |
Heliport provided |
Construction vessels |
|
|
|
|
|||
Name |
Type |
Laying |
Transport/ |
Maximum |
Pipelaying |
||
|
|||||||
Saipem 7000 |
Semi-submersible, self-propelled pipelay and DP vessel capable of lifting structures and J-laying pipelines in deep waters |
J |
14,000 |
3,000 |
32 |
||
Saipem FDS |
Multipurpose monohull dynamicalyy positioned crane and pipelay (J-lay) vessel utilised for the development of hydrocarbon fields in deep waters |
J |
600 |
2,100 |
22 |
||
Saipem FDS 2 |
Multipurpose monohull dynamicalyy positioned crane and pipelay (J-lay) vessel utilised for the development of hydrocarbon fields in deep waters. The vessel is equipped with a J-lay tower |
J, S |
2,000 |
3,000 |
36 |
||
Castoro Sei |
Semi-submersible pipelay vessel capable of laying large diameter pipe |
S |
300 |
1,000 |
60 |
||
Castoro Sette |
Semi-submersible pipelay vessel capable of laying large diameter pipe |
S |
|
1,000 |
60 |
||
Castoro Otto |
Crane and pipelay vessel |
S |
2,200 |
600 |
60 |
||
Saipem 3000 |
Mono-hull, self-propelled DP crane ship, capable of laying flexible pipes and umbilicals in deep waters and lifting structures |
2,200 |
|
|
|||
Bar Protector |
Dynamically positioned dive support vessel used for deep waters diving operations and works on platforms |
|
|
|
|
||
Semac 1 |
Semi-submersible pipelay vessel capable of laying pipes in deep waters |
S |
318 |
600 |
58 |
||
Castoro II |
Derrick/lay barge |
S |
1,000 |
|
60 |
||
Castoro 10 |
Trench/lay barge |
S |
|
300 |
60 |
||
Castoro 12 |
Shallow waters pipelay barge |
S |
|
1.4 |
40 |
||
S355 |
Derrick/lay barge |
S |
600 |
|
42 |
||
Crawler |
Derrick/lay barge |
S |
540 |
|
60 |
||
Castoro 16 |
Post-trenching and back-filling barge of pipelines operating in ultra-shallow waters (1.4 metres). |
|
|
1.4 |
40 |
||
Saibos 230 |
Derrick pipelay barge equipped with a mobile crane for piling, marine terminals and fixed platforms |
S |
|
|
30 |
||
Ersai 1 (a) |
Technical pontoon equipped with two crawler cranes, capable of carrying out installations whilst grounded on the seabed. |
|
2,100 |
|
|
||
Ersai 2 (a) |
Work barge equipped with a fixed crane capable of lifting structures |
|
200 |
|
|
||
Ersai 3 (a) |
Self-propelled workshop/storage barge used as support vessel, with storage space and office space for 50 people. |
|
|
|
|
||
Ersai 4 (a) |
Self-propelled workshop/storage barge used as support vessel, with storage space and office space for 150 people. |
|
|
|
|
||
Ersai 400 (a) |
Accomodation barge for up to 400 people, equipped with antigas shelter for H2S leaks. |
|
|
|
|
||
Castoro 9 |
Launching/cargo barge |
|
5,000 |
|
|
||
Castoro XI |
Heavy duty cargo barge |
|
15,000 |
|
|
||
Castoro 14 |
Deck cargo barge |
|
10,000 |
|
|
||
Castoro 15 |
Deck cargo barge |
|
6,200 |
|
|
||
S42 |
Deck cargo barge |
|
8,000 |
|
|
||
S43 |
Deck cargo barge |
|
|
|
|
||
S44 |
Launching/cargo barge |
|
30,000 |
|
|
||
S45 |
Launching/cargo barge |
|
20,000 |
|
|
||
S46 |
Deck cargo barge |
|
|
|
|
||
S47 |
Deck cargo barge |
|
|
|
|
||
S 600 |
Deck cargo barge |
|
30,000 |
|
|
||
FPSO - Cidade de Vitoria |
FPSO unit with a production capacity of up to 100,000 barrels a day |
|
|
|
|
||
FPSO - Gimboa |
FPSO unit with a production capacity of up to 60,000 barrels a day |
|
|
|
|