All data

Main operating data

 

2009

2010

2011

2012

2013

 

 

 

 

 

 

 

Offshore pipelines laid

(km)

1,000

1,365

1,682

1,435

1,106

Onshore pipelines laid

 

716

385

889

543

433

Offshore structures installed

(t)

62,333

46,606

105,033

122,765

206,959

Onshore structures installed

 

76,543

874,428

353,480

261,410

178,252

Offshore drilling

(km)

140

130

178

194

201

Onshore drilling

 

719

881

985

953

821

Offshore wells drilled

(units)

54

44

64

104

127

Onshore wells drilled

 

241

279

307

373

373

Drilling vessels

 

 

 

 

Name

Type

Drilling plant

Maximum depth (m)

Drilling maximum (m)

Other

Perro Negro 2

Jack up

Oilwell E 2000

90

6,500

Heliport provided

Perro Negro 3

Jack up

Ideco E 2100

90

6,000

Heliport provided

Perro Negro 4

Jack up

National 110 UE

45

5,000

Heliport provided

Perro Negro 5

Jack up

National 1320 UE

90

6,500

Heliport provided

Perro Negro 7

Jack up

National 1625 UE

115

9,150

Heliport provided

Perro Negro 8

Jack up

NOV SSDG 3000

107

9,100

Heliport provided

Scarabeo 3

Semi-submersible drilling platform helped propulsion system

National 1625 DE

550

7,600

Heliport provided

Scarabeo 4

Semi-submersible drilling platform helped propulsion system

National 1625 DE

550

7,600

Heliport provided

Scarabeo 5

Semi-submersible drilling platform helped propulsion system

Emco C 3

1,900

8,000

Heliport provided

Scarabeo 6

Semi-submersible drilling platform helped propulsion system

Oilwell E 3000

500

7,600

Heliport provided

Scarabeo 7

Semi-submersible drilling platform helped propulsion system

Wirth GH 3000 EG

1,500

8,000

Heliport provided

Scarabeo 8

Semi-submersible drilling platform helped propulsion system

NOV AHD-500-4600

3,000

10,660

Heliport provided

Scarabeo 9

Semi-submersible drilling platform helped propulsion system

Aker Maritime Ram Rig

3,650

15,200

Heliport provided

Saipem 10000

Ultra deep waters drillship, self-propelled, dynamic positioning

Wirth GH 4500 EG

3,000

9,200

Oil storage capacity: 140.000 bbl; heliport provided

Saipem 12000

Ultra deep waters drillship, self-propelled, dynamic positioning

NOV SSDG 5750

3,650

10,000

Heliport provided

Saipem TAD

Tender assisted drilling barge

Bentec 1500 Hp

150

4,877

Heliport provided

Construction vessels

 

 

 

 

Name

Type

Laying
technique

Transport/
lifting
capability
(t)

Maximum
laying
depth
(m)

Pipelaying
maximum
diameter
(inches)

(a)

Owned by the Saipem-managed joint venture ER SAI Caspian Contractor Llc.

Saipem 7000

Semi-submersible, self-propelled pipelay and DP vessel capable of lifting structures and J-laying pipelines in deep waters

J

14,000

3,000

32

Saipem FDS

Multipurpose monohull dynamicalyy positioned crane and pipelay (J-lay) vessel utilised for the development of hydrocarbon fields in deep waters

J

600

2,100

22

Saipem FDS 2

Multipurpose monohull dynamicalyy positioned crane and pipelay (J-lay) vessel utilised for the development of hydrocarbon fields in deep waters. The vessel is equipped with a J-lay tower

J, S

2,000

3,000

36

Castoro Sei

Semi-submersible pipelay vessel capable of laying large diameter pipe

S

300

1,000

60

Castoro Sette

Semi-submersible pipelay vessel capable of laying large diameter pipe

S

 

1,000

60

Castoro Otto

Crane and pipelay vessel

S

2,200

600

60

Saipem 3000

Mono-hull, self-propelled DP crane ship, capable of laying flexible pipes and umbilicals in deep waters and lifting structures

 

2,200

 

 

Bar Protector

Dynamically positioned dive support vessel used for deep waters diving operations and works on platforms

 

 

 

 

Semac 1

Semi-submersible pipelay vessel capable of laying pipes in deep waters

S

318

600

58

Castoro II

Derrick/lay barge

S

1,000

 

60

Castoro 10

Trench/lay barge

S

 

300

60

Castoro 12

Shallow waters pipelay barge

S

 

1.4

40

S355

Derrick/lay barge

S

600

 

42

Crawler

Derrick/lay barge

S

540

 

60

Castoro 16

Post-trenching and back-filling barge of pipelines operating in ultra-shallow waters (1.4 metres).

 

 

1.4

40

Saibos 230

Derrick pipelay barge equipped with a mobile crane for piling, marine terminals and fixed platforms

S

 

 

30

Ersai 1 (a)

Technical pontoon equipped with two crawler cranes, capable of carrying out installations whilst grounded on the seabed.

 

2,100

 

 

Ersai 2 (a)

Work barge equipped with a fixed crane capable of lifting structures

 

200

 

 

Ersai 3 (a)

Self-propelled workshop/storage barge used as support vessel, with storage space and office space for 50 people.

 

 

 

 

Ersai 4 (a)

Self-propelled workshop/storage barge used as support vessel, with storage space and office space for 150 people.

 

 

 

 

Ersai 400 (a)

Accomodation barge for up to 400 people, equipped with antigas shelter for H2S leaks.

 

 

 

 

Castoro 9

Launching/cargo barge

 

5,000

 

 

Castoro XI

Heavy duty cargo barge

 

15,000

 

 

Castoro 14

Deck cargo barge

 

10,000

 

 

Castoro 15

Deck cargo barge

 

6,200

 

 

S42

Deck cargo barge

 

8,000

 

 

S43

Deck cargo barge

 

 

 

 

S44

Launching/cargo barge

 

30,000

 

 

S45

Launching/cargo barge

 

20,000

 

 

S46

Deck cargo barge

 

 

 

 

S47

Deck cargo barge

 

 

 

 

S 600

Deck cargo barge

 

30,000

 

 

FPSO - Cidade de Vitoria

FPSO unit with a production capacity of up to 100,000 barrels a day

 

 

 

 

FPSO - Gimboa

FPSO unit with a production capacity of up to 60,000 barrels a day